Restaurant Electrical Contractors, Bay Area

Full electrical for restaurant build-outs and remodels across the Bay Area. Kitchen equipment power, hood and make-up air interlocks, dining and exterior lighting, and the Title 24 sign-off, sequenced against your opening date.

Why restaurants are different

What’s different about electrical in this building

The electrical scope shifts constantly, inspections stack in a specific order, and the opening date is often public before the equipment list is final.

kitchen

Late equipment loads

Cut sheets arrive after the panel is sized. Combi ovens, walk-ins, and fryer banks get added when the layout changes — each needing circuits we may not have roughed in yet.

air

Hood interlocks

Type I hoods require make-up air and fire suppression interlocks wired correctly the first time — tested with the mechanical sub before the fire marshal visit.

water_drop

Grease-rated fixtures

Fixtures in the hood line and prep areas need grease-environment ratings. Wrong spec means a failed inspection and a re-order that pushes your opening.

health_and_safety

Health dept. downstream

County sign-off sits after the electrical inspection. GFCI, hand-wash circuits, and walk-in power all need to pass before the health department schedules your final visit.

domain

Landlord vs. tenant scope

Base building power and panel location may be landlord work while kitchen distribution is tenant scope. Gray areas stall permits if nobody clarifies scope early.

event

Public opening date

Soft openings get announced before rough-in is complete. Marketing and deliveries lock to a date that doesn’t move — electrical has to hit milestones backward from that day.

light_mode

Dining room ambiance

Owners want dimmers, lunch-versus-dinner scenes, and bar accent — all programmed before the health inspector walks through a dark dining room.

storefront

Signage and patio

Channel letters, menu boards, and patio lighting need circuits and timers — separate from the kitchen scope but on the same opening checklist.

Services in this building

The work we do in this building

Same service lines as other commercial TI work — sequenced around a kitchen that has to pass inspection and open on time.

Coordination

Who we coordinate with

We stay in the loop with every party that can hold up your inspection or opening night.

engineering General contractor apartment Landlord’s construction manager local_shipping Kitchen equipment supplier hvac Mechanical sub on hood interlock health_and_safety Health department local_fire_department Fire marshal bolt PG&E on service
Timeline

Schedule reality

Opening dates are public and don’t move — whether or not the combi oven has arrived.

  • nightlight Night work is common on remodels and equipment tie-ins so the dining room can stay open during the day.
  • local_shipping Kitchen equipment arrives late — sometimes after rough-in closes. We track spare panel capacity for exactly this reason.
  • checklist Health department and fire marshal inspections sequence matters. Electrical rough and final must clear before suppression testing and the county walk-through.
Code & inspection

Compliance

Food service, fire, and energy codes converge in the same walk-through. We document what each inspector needs to see.

  • check_circle
    Health departmentGFCI in wet areas, prep circuits, and refrigeration power documented for county review.
  • check_circle
    Hood interlocksMake-up air and suppression interlock wiring tested with the mechanical sub before the fire marshal visit.
  • check_circle
    Title 24Kitchen and dining room lighting compliance with certified installers and third-party inspectors.
  • check_circle
    Grease-rated fixturesCorrect ratings in hood-adjacent zones — spec’d before order, not after a failed inspection.
Recent work

Proof

Build-outs, remodels, and exterior packages sequenced to opening dates.

Teriyaki Madness Restaurant build-out · Bay Area
FAQ

Restaurant electrical questions

Can you work nights so we don’t close the dining room? add

Yes. Night work is standard on remodels and equipment tie-ins. We coordinate shutdown windows with your GC so the dining room stays open.

Who pulls the permit on a leased shell, us or the landlord? add

It depends on the lease. We work under whichever party holds the permit and clarify scope splits early so sign-offs don’t stall your opening.

How late can the kitchen equipment schedule change before it costs us? add

The earlier we see final cut sheets, the better. Changes after rough-in mean added circuits or panel space. Late adds after the panel is ordered hit schedule and cost hardest.

Do you handle the health department electrical requirements? add

We install and document GFCI in wet areas, grease-rated fixtures, hood interlock wiring, and the circuits inspectors expect. Health department sign-off sits downstream — we coordinate so electrical clears first.

Can you add circuits after the kitchen equipment list changes? add

Yes, if the panel has capacity or we can upgrade in time. We track spare capacity during rough-in and add circuits before drywall closes when possible.