Lighting Controls

Commercial Lighting & Lutron Control Systems

Certified Lutron installers for commercial lighting control — system design, dimming, occupancy sensors, daylight harvesting, and scene programming for retail showrooms, restaurants, and offices across the Bay Area.

What’s included

From system design to programmed scenes

Commercial lighting controls are more than dimmers on a wall. We design, install, and program the full Lutron system so every zone responds correctly to occupancy, daylight, schedules, and manual overrides — ready for daily operation and code compliance.

How the work runs

Six steps from walkthrough to handoff

Every controls project starts with understanding how the space is used — then we design, install, and program a system your team can operate confidently on day one.

  1. Walkthrough and scope review

    We visit the site, review existing wiring and fixtures, and discuss how the space is used throughout the day. This is where we identify retrofit opportunities, integration needs, and any code requirements that affect control selection.

  2. System design and specification

    We select the Lutron platform, map control zones, specify devices, and produce a control narrative that aligns with your electrical plans and operating requirements. Design happens before procurement so there are no surprises in the field.

  3. Equipment procurement

    Panels, dimmers, sensors, wall stations, and network hardware are ordered to match the approved specification. Lead times vary by platform — we factor procurement into the project schedule from the start.

  4. Installation and wiring

    Low-voltage wiring, panel mounting, device installation, and ceiling sensor placement are coordinated with the lighting contractor and GC. Every wire is labeled and every zone is verified before energizing.

  5. Programming and scene setup

    After fixtures are live, we program control sequences, configure occupancy and daylight responses, build scene presets, and run functional tests in every zone. Adjustments are made on site before handoff.

  6. Training and handoff

    We walk your team through wall stations, scene buttons, schedule overrides, and remote management tools. Documentation includes zone maps, device locations, and programming notes for future changes.

Code, permits & compliance

Lutron controls and California energy code

Commercial lighting controls in California must meet mandatory measures under the Building Energy Efficiency Standards. Lutron systems are engineered to deliver the control functions the code requires — when installed and programmed correctly.

gavel Title 24 control requirements

Lutron commercial control systems address mandatory Title 24 measures including multi-level control, automatic shut-off, occupancy and vacancy sensing, daylight harvesting, and demand-responsive lighting where applicable. We confirm which measures apply to your specific alteration or new-build scope during the walkthrough.

tune Platform selection for compliance

Different Lutron platforms — Vive, RadioRA 3, HomeWorks QSX — meet different project scales and compliance paths. We select the system that satisfies the energy code requirements for your jurisdiction while matching your operational needs and budget.

fact_check Acceptance testing

When your project requires formal acceptance testing, our Title 24 certified team handles functional verification, documentation, and inspection coordination. Controls installed by us are programmed and tested before the formal acceptance test — not during it.

description Permits and plan check

Electrical permits and plan check requirements vary by city and county across the Bay Area. We coordinate with your GC and design team to ensure control narratives, device schedules, and wiring diagrams are included in the permit set when the jurisdiction requires them.

Equipment & manufacturers

Platforms we install and program daily

Lutron certification on our team means we design, install, troubleshoot, and commission Lutron systems without bringing in a separate controls vendor. We pair Lutron controls with commercial fixtures from trusted manufacturers.

tune

Lutron

RadioRA 3, Caseta, HomeWorks QSX, and Vive — from single-room retrofits to whole-building control with shade integration and remote management.

electrical_services

Leviton

Switches, receptacles, and standalone occupancy/vacancy sensors for smaller zones and code-required manual controls.

light

Lithonia

Commercial fixtures for open office, back-of-house, and high-bay applications with integrated or remote-mounted sensors.

Typical project profile

What to expect on scope and timeline

Scope range

From a single-zone dimmer retrofit in an existing retail space to a full building Lutron control system with shade integration, scene programming, and remote management. We scale the platform and crew to match the project.

Timeline

Most commercial lighting control projects run one to six weeks depending on zone count, ceiling type, equipment lead times, and whether the work is coordinated with a larger build-out or stand-alone retrofit.

What drives scope and cost

  • arrow_upward Higher scope: more control zones, shade integration, remote management, complex daylight harvesting, and open-to-structure ceilings with long sensor runs.
  • arrow_downward Lower scope: wireless Lutron Vive or Caseta on drop-ceiling layouts, single-platform retrofits, and early design involvement before rough-in.

Key variables

  • Number of control zones
  • Integration requirements (shades, AV, building management)
  • Retrofit vs new construction
  • Lutron platform selected
  • Title 24 acceptance testing requirements
Proof

Commercial lighting controls in the field

Recent commercial lighting projects where our crew handled fixture layout, control wiring, and Lutron programming for retail showrooms and commercial spaces across the Bay Area.

Retail track lighting installation with Lutron controls in San Jose

San Jose showroom lighting

Lutron controls · multi-zone dimming

Commercial showroom track lighting installation with Lutron control system

Commercial showroom track

Display zones with scene presets

Commercial retail lighting control installation in progress

Controls rough-in

Ceiling layout before programming

Where we do this work

Lighting controls by industry

Most of our Lutron control work arrives through tenant improvements and build-outs in these sectors. Each has different scene requirements, hours of operation, and ceiling conditions — we know the patterns.

Based in Fremont, we install and program Lutron lighting controls across the entire San Francisco Bay Area. See all service areas →

FAQ

Lighting controls questions

What Lutron systems do you install? add

We install and program Lutron RadioRA 3, Caseta, HomeWorks QSX, and Vive systems for commercial applications. RadioRA 3 and HomeWorks QSX handle whole-building and multi-zone control with shade integration and remote management. Vive is common on tenant improvements where wireless controls speed up retrofit work. We select the platform based on zone count, integration requirements, and whether the project is new construction or a retrofit.

Can you retrofit existing lighting with Lutron controls? add

Yes. Many Bay Area retail and restaurant projects upgrade existing fixtures without replacing every luminaire. We evaluate the current wiring, fixture types, and ceiling conditions during a walkthrough, then specify the Lutron platform and devices that fit the existing infrastructure — from single-zone dimmer swaps to full-panel retrofits with wireless occupancy sensors.

Do you program scenes for different times of day? add

Yes. Scene programming is a core part of every commercial controls project. We configure preset lighting levels for opening, daytime selling, evening ambiance, and after-hours security modes — tailored to retail showrooms, restaurant dining rooms, and office workspaces. Scenes can be triggered manually from wall stations, scheduled on a time clock, or tied to occupancy sensors.

Does a Lutron system help with Title 24 compliance? add

Yes. Lutron control systems are designed to meet California Energy Code requirements for occupancy sensing, daylight harvesting, multi-level control, and automatic shut-off. When installed and programmed correctly, a Lutron system provides the control functions Title 24 mandates. We handle the installation, programming, and — when required — acceptance testing so the controls pass inspection.

Get started

Book a walkthrough

Schedule a site visit and we’ll review your existing lighting, discuss scene requirements, and recommend the Lutron platform that fits your space and budget.